Skip to main content

Which QuickConnect Pull Head is Right for You?

The Pull Head for Every Project

QuickConnect pull heads are built to save time, protect crews, and increase profitability on every HDD or pipe bursting job. With our patented clamshell design, you eliminate the need for fusing in the trench, keep mud and fluids out of the pipe, and handle multiple conduits in a single pull when paired with the multi-pipe puller.

From maxi rigs tackling long, high-force installations to utility contractors running multiple service lines in tight corridors, QuickConnect offers the versatility to adapt to nearly any trenchless project.

Faster Installs

No fusing in the hole

Safer Crews

Less time underground

Versatile Applications

HDD, pipe bursting, multi-conduit pulls

Durable & Reusable

Heavy-duty construction, built in the USA

Choose Your Application

Which QuickConnect Pull Head is Right for You?

Feature / Application Maxi Rigs Utility Contractors
Pipe Sizes 4” – 36” 4” – 14”
Pulling Force Withstands >2x max pull force (ideal for long/heavy pulls) Built for lighter, shorter utility installs
Best For Long-distance HDD, large-diameter pipe, high-force projects Multi-conduit pulls, gas/electric/telecom/sewer service lines
Key Advantage Strength and durability for the toughest jobs Flexibility to pull multiple conduits in a single pass
Labor Savings Eliminates trench fusing, reduces crew time on mega projects Avoids custom harnesses, cuts down on extra runs
Applications HDD, pipe bursting, slip lining, and underground utilities HDD, utility corridors, municipal upgrades, service line replacements
ROI Impact Prevents costly delays on big projects Completes jobs faster so crews can move to the next
Feature / Application
Pipe Sizes
Pulling Force
Best For
Key Advantage
Labor Savings
Applications
ROI Impact
Maxi Rigs
4” – 36”
Withstands >2x max pull force (ideal for long/heavy pulls)
Long-distance HDD, large-diameter pipe, high-force projects
Strength and durability for the toughest jobs
Eliminates trench fusing, reduces crew time on mega projects
HDD, pipe bursting, slip lining, and underground utilities
Prevents costly delays on big projects
Utility Contractors
4” – 14”
Built for lighter, shorter utility installs
Multi-conduit pulls, gas/electric/telecom/sewer service lines
Flexibility to pull multiple conduits in a single pass
Avoids custom harnesses, cuts down on extra runs
HDD, utility corridors, municipal upgrades, service line replacements
Completes jobs faster so crews can move to the next

Choose Your Application